MONOGRAPH 2020
Erdy McHenry Architecture
marks 20 years!



WORK   
    Academic
    Cultural
    Agricultural & 
    Infrastructure

    Commercial
    Housing
    Health & Science
    Featured Projects

PRACTICE       
    Firm Profile
    Process
    Employment

AIA FIRM AWARD

MONOGRAPH 2020

LOCATIONS

    915 N. Orianna St.
    Philadelphia, PA, 19123
    (215) 925-7000

    555 South Mangum St.
    Suite 100
    Durham, NC 27701
    (984) 250-8775

TEACHING DAIRY FACILITY 



Client: NC State University 
Location: Raleigh, NC
Year: Anticipated Fall 2022
Area: 15 Acres of Pasture, 12,000 GSF built area
Sustainability: LEED  Registered


Synopsis:
EM led the design effort for Phase 1 which proposes a new 11,940 square foot dairy facility at the College of Veterinary Medicine’s (CVM) on-site Teaching Animal Unit (TAU) on the Centennial Biomedical Campus. The facility includes an animal housing area for the resident dairy herd, a new milking parlor, and associated support areas, including a veterinarian lab, milk room, equipment room, rest room, and observation area.

The new structure will feature an efficient and modern layout, with all-weather observation and direct access for cows to pasture, as well as improved treatment stalls and new equipment for milking, feed delivery, water, and waste handling. Most critically, the new facility will allow the Dairy Unit to expand the herd to 35-40 cows, and will help ensure the College can continue to meet the highest standards for the DVM professional curriculum.

This project demolished the outdated dairy milking parlor and a new dairy facility will be developed at the College of Veterinary Medicine’s (CVM) on-site Teaching Animal Unit (TAU), which merges teaching and live-animal experiential training with commercial operations for the Doctorate of Veterinary Medicine (DVM) program. The new facility will have a more efficient, modern layout with all-weather observation, direct access to the pasture, improved treatment stalls, and new equipment for milking, feed, water, and waste. The project extends utilities to the building and re-organizes the adjacent pastures for controlled vehicular access to the building to comply with biosecurity requirements. Consideration was given to relocating the calving shed and hutches to the east of the East Barn that will be displaced by the new construction.



Renderings
Construction

Erdy McHenry Architecture
915 N. Orianna St., Philadelphia, PA, 19123
© 2022

WORK
    ACADEMIC
    AG. + INFRA.
    COMMERCIAL
    CULTURAL
    HEALTH + SCI.
    HOUSING
    FEATURED 

CONNECT

︎  ︎  ︎  ︎
PRACTICE
    FIRM PROFILE
    PROCESS
    EMPLOYMENT




LOCATIONS

915 N. Orianna St.,
Philadelphia, PA, 19123

555 South Mangum St.,
Suite 100
Durham, NC, 27701

© 2022 Erdy McHenry Achitecture. All Rights Reserved